Multi-Engine Time Building in 2026: What Regional Airline Minimums Really Ask of You
Meta description: See what regional airline multi-engine minimums ask of you in 2026, and how to build twin time with the judgment, procedures, and FAA standards that matter.
If you’re building toward a regional airline cockpit, treat a published multi-engine minimum as a floor, not proof that you’re ready for airline training. Across the airline career pages I reviewed in November 2026, published first-officer requirements range from 25 hours of actual multi-engine time to 50 hours, while several airlines don’t publish a separate multi-engine figure. Those hours are more useful when each one builds sound procedures, judgment, and the ability to explain your decisions.
I’ve spent 30 years in aviation and remain an active Designated Pilot Examiner (DPE). In the checkride environment, and in the habits that carry forward to airline training, a logbook number only tells part of the story. The FAA’s Commercial Pilot Airplane ACS expects applicants to demonstrate knowledge, risk management, and skill, not simply time in the aircraft.
Regional airline multi-engine minimums in 2026
The following is a descriptive snapshot of published first-officer minimums checked in November 2026, not a hiring ranking or guarantee:
Piedmont lists 50 hours multi-engine and 250 hours PIC, alongside ATP or R-ATP minimums.
PSA, SkyWest, Endeavor, Horizon Air and GoJet list 25 hours of actual multi-engine time.
Envoy, Republic, Air Wisconsin and CommuteAir publish ATP or R-ATP minimums without stating a separate multi-engine hour figure. Mesa does not publish minimums.
PSA and GoJet list ATP-CTP in their minimums. Most of the airlines listed here specify a first-class medical.
Airlines revise qualifications. Confirm current requirements on each airline’s own career page before making a plan. Airline minimums also sit on top of FAA ATP or restricted ATP (R-ATP) rules; total flight time and the applicable 1,500-hour rule still drive eligibility.
Why “actual multi-engine time” matters
“Actual” distinguishes time in a multi-engine aircraft from time in a simulator or training device. If an airline specifies actual multi-engine time, do not assume simulator time meets that requirement. For other FAA experience requirements, simulator or training-device credit is governed by applicable regulations and limitations; it is not a blanket substitute for an airline’s stated actual-aircraft minimum.
But actual time alone is not the whole story. Two pilots can log the same number of hours and come away with very different experience. One may have repeated the same familiar route with little structured practice. Another may have briefed each flight, worked through aircraft-specific procedures, managed changing conditions, and debriefed what could improve.
The FAA’s Airplane Flying Handbook, multiengine chapter, emphasizes that twin-engine operation demands both control and performance awareness. It also directs pilots and instructors to the aircraft’s AFM/POH for procedures specific to that airplane. The logbook records time; your preparation and judgment show what you did with it.

What the 25-versus-50-hour gap tells you
A 25-hour published minimum is an eligibility figure, not a readiness certificate. Fifty hours gives you more opportunity for repetition, variety, and decision-making practice, but the number alone doesn’t establish proficiency.
It’s reasonable to use a 50-hour target as a planning benchmark for building consistency: recognizing what’s happening, applying the correct aircraft procedure, and making a deliberate decision without treating every engine-out exercise as a brand-new event. That’s an instructional interpretation, not a claim about any airline’s unpublished hiring intent.
The FAA ACS reinforces this distinction. The commercial pilot standard includes tasks involving engine failure, one-engine-inoperative operation, and risk management. The Flight Instructor Airplane ACS adds an instructor’s responsibility to demonstrate and explain those tasks. Experience becomes valuable when it makes your performance more repeatable.
A practical plan to build multi-engine time
1. Earn the commercial multi-engine add-on first
Start with a structured rating program rather than renting a twin simply to accumulate hours. The add-on gives you a foundation in aircraft handling, performance, systems, and FAA-standard procedures. Before each flight, know the objective; afterward, write down what you learned and what needs work.
2. Build time with a syllabus
Plan each hour around a purpose: aircraft handling, instrument procedures, performance planning, systems, or scenario-based decision-making. Vary the conditions and tasks only when it is safe and appropriate, and use aircraft-specific checklists and AFM/POH procedures.
A repeatable flight cycle is simple:
Before: Review the objective, weather, aircraft performance, checklist flow, and risks.
During: Fly to the objective, maintain checklist discipline, and use realistic scenarios agreed upon in the briefing.
After: Debrief what went well, what needs improvement, and what the next flight should reinforce.
3. Consider the MEI route for instructional judgment
A Multi-Engine Instructor (MEI) rating can turn time building into teaching practice: explaining procedures, anticipating student questions, and managing training risk. It is not automatically the best route for every pilot. Consider your goals, qualifications, finances, and the opportunity to instruct, and confirm that every flight is logged correctly under applicable rules.
For a structured progression, see Ace Pilot Academy’s multi-engine rating-to-MEI training path and DPE-built MEI ground school.

What a DPE or airline interviewer may ask about your hours
A DPE evaluates performance against the applicable ACS and the aircraft’s procedures. An airline interviewer may explore how you think and communicate; each airline’s process is its own. Be prepared to discuss, not just recite:
Vmc and the critical engine: What the terms mean in the aircraft you flew, and how control and safety shape your actions.
Single-engine climb performance: What the AFM/POH data says under the conditions in your scenario, and what your plan is if the aircraft cannot climb. Drift-down planning is one of the broader performance skills this experience should build.
Feathering and securing logic: How you distinguish the immediate priorities from checklist items, following aircraft-specific procedures.
Systems knowledge: How relevant aircraft systems work and what indications would influence your actions.
Decision-making: Given a realistic change in weather, aircraft performance, or system status, how would you assess risk, use available resources, and choose a safe course?
The point is not to invent a perfect answer on the spot. It’s to explain a safe, considered process grounded in the aircraft’s approved procedures and your training.
Standardization makes hours transferable
In a small twin, consistent checklist use, briefings, and debriefings are practical habits, not paperwork. Use the same callouts and flows your instructor teaches, verify actions rather than relying on memory alone, and speak up when a procedure is unclear. These habits support standardized operations and make it easier to learn a new aircraft and training program.
The FAA Aviation Instructor’s Handbook is a useful reference for planning instruction, communication, and assessment. Its teaching principles apply whether you’re training for yourself or developing as an instructor.
Red flags in a time-building plan
Reconsider a plan that involves:
Choosing the cheapest available twin with no training syllabus.
Logging hours without a preflight briefing or postflight debrief.
Never flying at the heavier end of the loading envelope, where density altitude, runway length, and climb performance actually bite.
Avoiding crosswinds instead of building that experience with an instructor while conditions and your proficiency allow.
Leaving instrument-weather experience until the last minute, rather than developing instrument proficiency inside your ratings, training, and personal minimums.

Frequently asked questions
How many multi-engine hours do I need for a regional airline?
It depends on the airline’s current published requirements. In November 2026, several listed 25 hours of actual multi-engine time, Piedmont listed 50 hours, and some published ATP or R-ATP minimums without a separate multi-engine figure. Verify the specific airline’s current career page.
Does simulator time count toward multi-engine minimums?
Not when a listing explicitly requires actual multi-engine aircraft time. Simulator and training-device credit toward FAA experience requirements depends on the applicable rules and approved device or program; confirm both the airline’s wording and FAA requirements.
How long does it take to build 50 hours of multi-engine time?
Estimate it from your scheduled flying pace: at two multi-engine hours per week, 50 hours takes 25 flying weeks. Weather, maintenance, scheduling, and your training objectives can extend the calendar time.
Is CFI/MEI time the best way to build multi-engine time?
It can be a strong option if you want to teach and can qualify for the role. Instructing adds explanation, preparation, and risk-management responsibilities. It isn’t the only route, and the right choice depends on your career plan and available opportunities.
Build hours that tell a story
Your multi-engine hours should show more than time in a logbook. Build them through structured flights, consistent procedures, aircraft-specific knowledge, and thoughtful decisions. Start this week: review your target airline pages, choose a training objective, and schedule a briefing and debrief around your next twin flight.


Comments